Maya Maya airport - Brazzaville

Airport

Formerly managed by the National Agency of Civil Aviation (ANAC), the Brazzaville airport has been managed since 2011 by Aéroports du Congo (AERCO)


Mission context

Within the scope of the project to reconstruct and modernise the terminal facilities at MAYA-MAYA Airport in Brazzaville. Project including rebuilding of the airport on an occupied site, a flying club, an equipment storehouse and an R+4 hotel


Project

Delegated project owner assistance for the modernisation and extension of MAYA-MAYA airport in Brazzaville

  • Construction of a new 40,000-sq.m. air terminal
  • Collaboration with Socotec, leading international group in risk management
  • Inspection and commissioning.
Project owner assistance:
  • Inspection and monitoring of work by all trades.
  • Inspection of working drawings, monitoring of work-execution compliance and sign-off of contractors’ invoices.
Assessment of terminal equipment provided by the Chinese contractor WIETC:
  • Electrical distribution system
  • Power generators
  • Arrival/departure baggage processing
  • Airbridges
  • Lifts
  • Display screens / traffic management
  • Sound equipment
  • Fire detection
  • Signage
  • Airport furniture.